Newsroom

Newsroom

About the Iconic Arapiles 13

We have been awarded the implementation of Lexer’s offices in Madrid

Repositioning of the Madrid South Shopping Center

Working at the Europa Hotel in Puerta del Sol

Efficiency and Sustainability in Construction

The Spanish Office Association welcomes FLULLE

Our Completion Rate is 100% For Our Projects With Colonial in 2023

The First Modern Gem of Barcelona Shines Again

FLULLE wishes you a Merry Christmas and a Prosperous 2024!

Grupo Anaya Wins Best Office Implementation Award at AEO Awards

Our Completion Rate is 100% For Our Projects With Colonial in 2022

FLULLE at Wellference 2023

We just open our Barcelona office!

FLULLE attends the first AENOR FOCUS SDG meeting

FLULLE pays a visit to Grupo Porcelanosa

Merry Christmas & Happy New Year 2022

FLULLE attends the National Environmental Convention, CONAMA 2021

We landed in the 22 @ District of Barcelona, ​​LOOM Hardware target

FLULLE has successfully passed the integrated quality management for QC and EP Monitoring Audits

We hoist and install AC systems at 100, Ortega Y Gasset street in Madrid, Spain

Putting the finishing touches on the refurbishment of the Business World Building in Alicante, Spain

FLULLE wishes you Happy Holidays and a Happy New Year 2021

We met 30 years

FLULLE will execute construction works for 1.5 million Euros to open the first Regus center at the port of Alicante, Spain

FLULLE is certified by ISO 9001 and ISO 14001 standards

Alfonso de las Peñas, new Managing Director at FLULLE

About the Iconic Arapiles 13

UAX GOVADE FLULLE

One of the major comprehensive rehabilitation projects signed in 2021 by Tétris as the general contractor and FLULLE as its installer is Arapiles 13, where a landmark 15,500m² office building spread over 20 floors rises in the heart of the Chamberí neighborhood in Madrid.

The property owner and project developer, after the departure of its long-standing tenant, aims to reposition the asset and update it in every way to make it an attractive and competitive property within the Madrid office market.

The project specifically addresses the structure and proposes an innovative conditioning of both the interior and exterior spaces. It also includes the complete replacement of the building’s systems and façade, improving the building’s conditions in terms of energy consumption reduction, restroom cores, elevators, and more.

FLULLE Installations is responsible for the execution of the new installations: Electricity and Lighting (including a new Transformer Station), Photovoltaics, Voice/Data, Security, Fire Protection, Plumbing and Sanitation, Heating and Ventilation systems—ultimately, an ambitious project that requires highly skilled professionals.

In addition, the implementation of the new tenant, UAX (Universidad Alfonso X el Sabio), was subsequently carried out, in which FLULLE  role was exactly the same as in the previous phase. We were responsible for the necessary installations to complete this implementation, which, like the building's rehabilitation, was awarded to Tétris.

We are grateful to Tétris for trusting FLULLE once again to accompany them in achieving another major professional challenge such as this one.

With this, FLULLE reaffirms its role as a flexible partner, thanks to its capacity for execution as an expert and reliable installer, with more than 30 years of experience in the sector for other main contractors.

#flexibletothelimit