Newsroom

Newsroom

New Project | TAI School — Madrid Pozuelo University Campus

New project signed: Ayala 42, Madrid.

FLULLE, present in the projects that marked the conversation at Workplace Evolution 2026 by Grupo Vía

AEO visits MADNUM by Colonial SFL, a benchmark of the new corporate Madrid

FLULLE carries out the lifting and nighttime assembly of a key part of the slab at the Madrid Sur Shopping Centre

FLULLE 2025 New Year´s Message

30+5 Years Flulling with You

FLULLE strengthens its technical capabilities with an in-house metalwork division

FLULLE Facility Services (FFS): “Keeping your property up to date while also reducing costs”

The FLULLE Warehouse: A Key Logistics Hub Powering Our Projects

FLULLE is carrying out the refurbishment of the Room Mate Macarena Hotel on Madrid’s Gran Vía.

FLULLE awarded the Utopicus + The Social Project at Madnum Building, Madrid

A Small Gesture, A Big Meaning

Our most desired bottles

Merry Christmas and Happy 2025!

About the Iconic Arapiles 13

We have been awarded the implementation of Lexer’s offices in Madrid

Repositioning of the Madrid South Shopping Center

Working at the Europa Hotel in Puerta del Sol

Efficiency and Sustainability in Construction

The Spanish Office Association welcomes FLULLE

Our Completion Rate is 100% For Our Projects With Colonial in 2023

The First Modern Gem of Barcelona Shines Again

FLULLE wishes you a Merry Christmas and a Prosperous 2024!

Grupo Anaya Wins Best Office Implementation Award at AEO Awards

Our Completion Rate is 100% For Our Projects With Colonial in 2022

FLULLE at Wellference 2023

We just open our Barcelona office!

FLULLE attends the first AENOR FOCUS SDG meeting

FLULLE pays a visit to Grupo Porcelanosa

Merry Christmas & Happy New Year 2022

30 + 1 años de experiencia a tu servicio

ESG Spain 2021

Avanzan las obras de LOOM Ferretería en 22@ de BCN

FLULLE attends the National Environmental Convention, CONAMA 2021

We landed in the 22 @ District of Barcelona, ​​LOOM Hardware target

FLULLE has successfully passed the integrated quality management for QC and EP Monitoring Audits

We hoist and install AC systems at 100, Ortega Y Gasset street in Madrid, Spain

Putting the finishing touches on the refurbishment of the Business World Building in Alicante, Spain

FLULLE wishes you Happy Holidays and a Happy New Year 2021

We met 30 years

FLULLE will execute construction works for 1.5 million Euros to open the first Regus center at the port of Alicante, Spain

FLULLE is certified by ISO 9001 and ISO 14001 standards

Alfonso de las Peñas, new Managing Director at FLULLE

FLULLE has successfully passed the integrated quality management for QC and EP Monitoring Audits

We have the pleasure of announcing that, after three days of auditing, at FLULLE we have met the Monitoring Audit standards for our integrated QC and EP management systems, certified by AENOR for FLULLE Fit-Out and Property Upgrade, and FLULLE Installations.

The scope of our certifications includes execution and project maintenance activities in low and medium voltage electrical facilities, telecoms projects and installation and fire protection maintenance in our installations area. The same applies to our construction, refurbishment and maintenance activities (Facility Services) in our construction area.

At FLULLE we opt for quality on our jobs, our clients’ satisfaction, and sustainability, respect and care for the environment as fundamental values of our work culture, as is depicted on the obtained recognition.

We want to communicate our gratitude for the effort and dedication to all FLULLE members and associates.

There is only one way to build the future: together

Flexibles al límite™