Client: PREPLY
Main Contractor: TETRIS
Installation Subcontractor: FLULLE
The client, a fast-growing EdTech company, had defined together with their design team an office concept that was open, modular and ready for hybrid work. The layout included focus areas, project rooms, training spaces and social zones.
To make all of that work in real life, something less visible but absolutely critical was needed: a robust, flexible technical infrastructure, ready for future changes.
This is where FLULLE comes in. Our scope was focused exclusively on the execution of the building services installations, working alongside the general contractor and the design team to ensure that every design decision had the right technical response behind it




As installer, FLULLE was responsible for the execution and commissioning of the main technical systems in the new workspace:
Power and lighting installation
HVAC and ventilation
Voice, data and communications
Life safety, security and control systems
All with one clear premise: leave an orderly, accessible and easily scalable system that can support the evolution of the business without major construction works.




The modular concept of the office was directly reflected in how installations were planned:
This way, if the client decides tomorrow to convert a work area into a training room or split a large meeting room into two smaller ones, the technical backbone is already prepared to handle it with minimal intervention.
Although FLULLE worked only as installer, the project required close coordination with:
We worked with a milestone-based schedule, aligning our installation phases with the progress of the construction works to minimise rework and shorten overall project timelines.
Beyond simply “making it work”, FLULLE’s approach was strongly focused on real use and life cycle of the installations:
Thanks to a technical infrastructure designed for flexibility from day one, the client now has:
At FLULLE we understand that, in projects like this, installations are the nervous system of the space: you don’t see them, but everything depends on them. Our role was to build that foundation with rigour, flexibility and alignment with the client’s and project team’s vision.